Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
Casing Make-Up Torque
HSE Plan (Example)
Waste Management Strategy - cuttings discharge
Inflow Testing Procedure
Well Control Drills and Exercises
Classification of BOP and well control equipment.
Single-shot inclination-only survey tools (TOTCO)
Packer Setting Mechanism
Tripping Operations - Best Practices
Drilling program example (Semi-Sub)
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Drilling
Articles
Burst Pressure vs. Wear (remaining wall thickness)
Pressure in Gas Column Calculation
Critical Rotary Speed Calculation - Drill Pipe and Drill Collar
Pressure Losses Hydraulics Calculation
BP Well Control Toolkit
Total Flow Area Calculation
Fracture Gradient Calculation
Mud Rheology Calculation
Cuttings Slip Velocity Calculation
Minimum Flow Rate for Hole Cleaning Calculation
Equivalent Circulating Density (ECD) Calculation
BOP Accumulator Capacity Calculation
Kick Tolerance Calculation
Mud Compressibility Calculation
Conventional multi-shots magnetic survey tools: Pre-survey checklist & Running procedure
Running procedures for solid state magnetic multi-shot directional survey tools
Best Practices for Running Recoverable Survey Instruments
Correction for Magnetic Azimuths
Surveying Wells with No Anticipated Well Control Problems
Surveying Wells with Anticipated Well Control Problems
Data Recording for Horizontal and ERD wells
Declination and Grid Convergence Definition
Directional Surveying Standards
Surveying Responsibilities
Slim hole, coiled tubing and under-balanced drilling surveying
Kick-off and Initial Build Section
Survey policy
Surveying definitions
North Seeking gyro - Common tools description
Tie-In Data
Survey Programme Example
Directional Drilling Planning
Positional Uncertainty
Survey evaluation
Inertial Navigation Survey Systems
Bit Selection and Hydraulics
Directional drilling plan with hole opener and under-reamer
Survey program and report
Gyro Multi-Shots
Correction programmes for magnetic survey
Well Plots
Magnetic surveying techniques
Steerable Systems
Directional Drilling Responsibilities
Guidelines for Rotary Directional Drilling
Solid state magnetic survey tools
Measurement While Drilling (MWD) Tool
Conventional magnetic single-shot survey tools: Pre-survey checklist and Running procedures
Magnetic Multi-Shots
Electronic Magnetic Multi-Shots
Directional Drilling Exercices
Measurement While Drilling (MWD) General Guidelines
Survey tools and techniques
Introduction to Magnetic Surveys
Directional BHA considerations
Wellpath planning and anti-collision monitoring - COMPASS
Gyro Single Shots
Magnetic Single Shots
Directional drilling plan with 12.25" pilot hole, 22" hole hole opener and 24" underreamer
Wireline steering techniques
Borehole representation
Teledrift - Inclination-only MWD
Wireline Surveying Techniques
Horizontal well surveying
BHA Components and Inspections
North seeking gyro survey tools
Gyro Surveys - QA/QC
Measurement While Drilling (MWD) - QA/QC
Conventional Gyroscopic Survey Tools
Conventional gyro: pre-survey checklist and running procedure
Conventional magnetic survey tools
Non-Magnetic Drill Collars
Survey Programme
Introduction to Gyro Surveys
Measurement while drilling (MWD) - Introduction
Definition of Surveying Terms
Single-shot inclination-only survey tools (TOTCO)
Baryte plugs to cure losses
Responsibilities during Fishing Operations
How to avoid Hole Related Problems
Lost Sidewall Sample Bullets
Effective Pull On Stuck Pipe
Changing a Bottom Hole Assembly
Miscellaneous Fishing Tools
Lost Circulation
Stretch graph for 3.5" and 5" Drilll Pipe
Freeing Differentially Stuck Pipe
Formation Instability
Fishing Planning and Preparation
Problems encountered in drilling extended reach and horizontal wells
Fishing tools selection
Backing-off procedure with top drive
Backing off Procedures
Stuck Pipe Prevention
Chemical Cutters for Stuck Tubing or Drillpipe
Drilling Unconsolidated Formations
Pipe Sticking
Fishing Guidelines
Differential Sticking (Cause of Stuck Pipe)
Back-Off Procedures
Spotting Fluids to Free Stuck Pipe
Pilot Mill
Fishing with Spears
Fishing in slim hole wells
Hole Cleaning
Use of Drag charts for hole cleaning - WellPlan
Fishing with Junk Subs
Overpulls/ Stuck Pipe In Surface Hole
Mechanical Sticking (cause of stuck pipe)
Preventing Differential Sticking
Fishing with Washover Strings
Jarring precautions
Fishing with Junk Retrievers
Junk Mill
Pulling Stuck Pipe
Fishing with Overshots
Jarring Stuck Pipe
Taper Mills
When to Give Up Attempts to Free the Pipe
Tripping Procedure in tight hole
Fishing Assemblies and tools
Milling Guidelines
Fishing Tools: Drilling/ Fishing Jars,Accelerators, Bumper Subs
Hole Cleaning Tips
Stuck Casing - Remedial Action
Stuck Pipe - Free Point Determination
Responsibilities for Abandonment
Mechanical power to the bit / corehead
Abandonment programme - oil producer
Responsibilities during drilling operations
Minimum safety stock for HPHT operations
Planning requirements for Managed Pressure Drilling (Mud Cap)
Abandonment guidelines
Ingram Cactus: Exact 15 Universal Slim-hole wellhead system
Underreaming
Mud cooler for HPHT wells
Drilling Standards
Drilling Programme - Preparation and Content
Mechanisms of rock cutting
8.5" Section Drilling Programme HPHT
HPHT procedures
Conversions factors
Sequence of Operations - Typical Offshore Well
Cooper Oil Tools: MC2 compact wellhead
Sequence of Operations - Typical Onshore Well
Rig Team HPHT Checklists
Standard Drilling Tools
Whipstock Milling Operation - Best Practices
Multilateral drilling programme
Acronyms and Abbeviations
Well Planning Information Sheet
Drill string vibrations
Operations with Mud Cap Drilling (MPD, Managed Presure Drilling)
Abandonment and sidetrack drilling programme
HPHT Drilling Procedures
Final / End of Well Report
Sidetracking out of Casing with Whipstock
Drill Pipe String Design (example)
Sidetracking Guidelines
General Guidelines for Sidetracking
Drilling programme 12.25" section HPHT
Depth Referencing
Guidelines for Site Survey/ Hazard Requirements for Drilling Units
Diving operations in exploration drilling
Types of vessel, offshore support
Surveying requirement for exploration well
Surveys required before rig move - Offshore
Land rig on artificial island (shallow water)
Modularised and Pile Elevated Drilling Rig
Drilling Rig on Pre-Installed Piles and Modules for shallow water depth
Land rig on barge (with optional submerged caissons)
Posted Barge With Land or Modular Drilling Rig
Heli-Rig
Submersible drilling rig
Stand-by vessel duties, equipment and standards
Jacket Supported “Offshore’’ Rig
Steel Caisson and Drilling rig
Semi-Submersible
Standard Jack-Up
Cantilever Drilling Barge
Swamp Barge (With Optional Submerged Caissons)
Shallow Draft Jack-Up
Drilling program example (Semi-Sub)
Truck Driver Rig Move Toolbox Meeting
Responsibiliites for Rig Move, Site Preparation and Site restoration
Rig Move Inspection Requirements (Onshore Operations)
Site Restoration
Rig Move Dailly Report (Onshore and Ofshore)
Onshore Rig Moves - Well Status
Offshore Rig Moves Planning and Preparation
Site Preparation for Land Wells
Responsibilities during offshore rig moves
Offshore Rig Move Plan
Onshore Rig Move Plan - Table of Content
Rig Move Planning (Safety and Review)
Offshore Rig Moves
Vibration minimisation for continuous coring in Slim Hole Drilling
Vibration minimisation for conventional Slim Hole Drilling
Muds, hydraulics and lost circulation for Slim Hole Drilling - downsized conventional drilling
Muds, hydraulics and lost circulation for Slim Hole Drilling - Continuous coring
Evaluation of slim hole wells
Surveying Slim Hole Wells
Continuous coring method - Slim Hole Wells
Downsized conventional drilling - Slim Hole Wells
Environmental impact of Slim Hole Drilling
Historical problems with slim hole drilling
Rigs for Slim Hole Drilling
Wellheads, Xmas trees and BOPs for Slim Hole Wells
List of companies - Slim Hole Wells services
Coring in Slim Hole Wells
Well control for slim hole wells
Drill string design (slim hole wells)
Casing, liners and cementing for Slim Hole Wells
Production testing - Slim Hole Wells
Slim hole well wireline logging
Slim hole Wells - Overview
Completion technology for Slim hole wells
Slim hole Drilling Techniques
Approval to commence operations - Standards
Mangement of Change Standards
Safety Management Standards
Testing Standards
Coring Standards
Completion Standards
Abandonment Standards
Dailly Drilling Report Standards
Incident Reporting Standards
Cementing Standards
Barriers Standards
Tripping - Standards
Simultaneous Operations Standards
Well Operations Management Standards
Drilling Fluids Standards
Geology, Logging, Mudlogging & RTC - Standards
Drill String and BHA Management Standards
Drillpipe and Bottom Hole Assembly - Standards
Coiled Tubing Standards
Shallow Gas Standards
H2S Standards
HPHT Wells - Standards
Rig Acceptance Standards
Well Control Standards
Rig Move - Standards
Survey and Collision Avoidance Standards
Operation Programmes Standards
Wellheads and Xmas Trees Standards
Pressure Testing Standards