Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Drilling safety guidelines
  • Pressure Testing Standards
  • Basics of Electric Wireline Logging
  • Classification of BOP and well control equipment.
  • Well Control Standards
  • Tripping Operations - Best Practices
  • Sub-surface safety valves (SSSV)
  • Connection types

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Casing
Articles
Intermediate string
Surface string
Production string
Conductor string
Liner
Stove pipe, marine conductor or foundation pile
Casing types definitions
Connections Selection and ordering
Casing Thread protectors
Connections Surface treatments
Connections Testing and qualification
Reliability and structural integrity of connections
Casing Thread Compounds Friction Factors
Connection Thread compounds
Connection sealing
Connection types
Monitoring Casing Wear
Minimising Casing Wear
Casing wear and solutions
Monitoring Casing Condition
Influence of wear on casing strength
Influence of fatigue on casing strength
Influence of corrosion on casing strength
13.3/8 " Casing Running Programme
Weight Set Tie-Back Packer Make-Up
4 1/2" liner running program example
Casing and Liner Operations Planning
Casing Patches
Casing and Liner Handling
Tie-Back Packers - PBR Clean Out and Packer Setting
4 1/2" Liner running programme
Example Casing Centralisers Programme
Casing and Liner Running Preparation Guidelines.
Ordering casing
Casing Setting Depths
External Casing Packers
Casing and Liner Colour Codes
Running and Setting Tie-Back Packer
Tie-Back Packers - General Information
Hole Conditioning before Running Casing or Liner
Casing Centralisation
Casing Operations Responsibilities
Procedure For Running 30” Conductor
Liner Lap Testing - Inflow Testing
Mandrel Casing Hangers
Preparation for Running Casing
Liner Tie-Back String
Casing Storage, Handling and Transport
Casing and Liner Pressure Testing
Casing and Liner Running Procedures
Running and Testing Casing
7" Liner Operations (Running and Cementing)
Casing Make-Up Torque
Post-buckling analyses
Service loads
Fundamental equation for reduced axial force
Installation loads
Stove pipe, foundation pile, marine conductor and conductor string
Installation loads
Resistance to buckling
Service loads
Load bearing capacity
Pressure (Collapse and Burst) loads on casing
Collapse loads
Burst loads
Pressure loads (burst and collapse)
Casing Design Loads
Liner hanger selection - Design criteria
Detailed Design and Analysis
Basic aspects of rock mechanics
Casing scheme selection
Casing Design parameters
Casing design considerations
Procedures for leak-off and limit tests (LOT, LT, FIT)
Casing design factors
Reservoir compaction environment
Gas-lift well
Slim hole well
Permafrost well
Steam well
Horizontal well
Gravity structure
Squeezing salt well
HPHT well
Deep-water well