Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
Casing Make-Up Torque
HSE Plan (Example)
Basics of Electric Wireline Logging
Pressure Testing Standards
Drilling safety guidelines
Tripping Operations - Best Practices
Well Control Standards
Classification of BOP and well control equipment.
Sub-surface safety valves (SSSV)
Waste Management Strategy - cuttings discharge
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Casing
Articles
Intermediate string
Surface string
Production string
Conductor string
Liner
Stove pipe, marine conductor or foundation pile
Casing types definitions
Casing Thread protectors
Connections Selection and ordering
Connections Surface treatments
Connections Testing and qualification
Casing Thread Compounds Friction Factors
Reliability and structural integrity of connections
Connection Thread compounds
Connection sealing
Connection types
Monitoring Casing Wear
Minimising Casing Wear
Casing wear and solutions
Monitoring Casing Condition
Influence of fatigue on casing strength
Influence of wear on casing strength
Influence of corrosion on casing strength
Weight Set Tie-Back Packer Make-Up
13.3/8 " Casing Running Programme
4 1/2" liner running program example
Casing and Liner Operations Planning
Tie-Back Packers - PBR Clean Out and Packer Setting
Casing and Liner Handling
Ordering casing
Casing Setting Depths
4 1/2" Liner running programme
External Casing Packers
Tie-Back Packers - General Information
Casing and Liner Running Preparation Guidelines.
Casing Patches
Example Casing Centralisers Programme
Casing and Liner Colour Codes
Casing Operations Responsibilities
Hole Conditioning before Running Casing or Liner
Running and Setting Tie-Back Packer
Casing Centralisation
Procedure For Running 30” Conductor
Liner Lap Testing - Inflow Testing
Mandrel Casing Hangers
Liner Tie-Back String
Casing and Liner Pressure Testing
Preparation for Running Casing
Casing Storage, Handling and Transport
Casing and Liner Running Procedures
Running and Testing Casing
7" Liner Operations (Running and Cementing)
Casing Make-Up Torque
Fundamental equation for reduced axial force
Service loads
Installation loads
Post-buckling analyses
Installation loads
Resistance to buckling
Stove pipe, foundation pile, marine conductor and conductor string
Service loads
Load bearing capacity
Pressure (Collapse and Burst) loads on casing
Collapse loads
Burst loads
Pressure loads (burst and collapse)
Casing Design Loads
Liner hanger selection - Design criteria
Detailed Design and Analysis
Basic aspects of rock mechanics
Casing scheme selection
Casing Design parameters
Casing design considerations
Casing design factors
Procedures for leak-off and limit tests (LOT, LT, FIT)
Reservoir compaction environment
Gas-lift well
Slim hole well
Permafrost well
Steam well
Gravity structure
Squeezing salt well
Horizontal well
HPHT well
Deep-water well