Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
Casing Make-Up Torque
HSE Plan (Example)
Waste Management Strategy - cuttings discharge
Inflow Testing Procedure
Well Control Drills and Exercises
Classification of BOP and well control equipment.
Single-shot inclination-only survey tools (TOTCO)
Packer Setting Mechanism
Tripping Operations - Best Practices
Drilling program example (Semi-Sub)
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Casing
Articles
Surface string
Conductor string
Intermediate string
Production string
Liner
Casing types definitions
Stove pipe, marine conductor or foundation pile
Reliability and structural integrity of connections
Connections Surface treatments
Connections Selection and ordering
Connections Testing and qualification
Casing Thread Compounds Friction Factors
Casing Thread protectors
Connection Thread compounds
Connection sealing
Connection types
Monitoring Casing Condition
Monitoring Casing Wear
Casing wear and solutions
Influence of wear on casing strength
Influence of fatigue on casing strength
Minimising Casing Wear
Influence of corrosion on casing strength
Weight Set Tie-Back Packer Make-Up
4 1/2" liner running program example
13.3/8 " Casing Running Programme
Casing Operations Responsibilities
Tie-Back Packers - General Information
Tie-Back Packers - PBR Clean Out and Packer Setting
Casing Setting Depths
Casing and Liner Running Preparation Guidelines.
Casing and Liner Handling
Ordering casing
External Casing Packers
Casing and Liner Operations Planning
Casing and Liner Colour Codes
Example Casing Centralisers Programme
Casing Centralisation
Casing and Liner Pressure Testing
Casing Patches
4 1/2" Liner running programme
Hole Conditioning before Running Casing or Liner
7" Liner Operations (Running and Cementing)
Procedure For Running 30” Conductor
Liner Lap Testing - Inflow Testing
Liner Tie-Back String
Running and Setting Tie-Back Packer
Preparation for Running Casing
Running and Testing Casing
Casing Storage, Handling and Transport
Mandrel Casing Hangers
Casing and Liner Running Procedures
Casing Make-Up Torque
Fundamental equation for reduced axial force
Post-buckling analyses
Installation loads
Service loads
Service loads
Stove pipe, foundation pile, marine conductor and conductor string
Installation loads
Resistance to buckling
Load bearing capacity
Collapse loads
Burst loads
Pressure (Collapse and Burst) loads on casing
Casing Design Loads
Pressure loads (burst and collapse)
Basic aspects of rock mechanics
Liner hanger selection - Design criteria
Detailed Design and Analysis
Casing scheme selection
Casing Design parameters
Casing design considerations
Procedures for leak-off and limit tests (LOT, LT, FIT)
Casing design factors
Reservoir compaction environment
Deep-water well
Gravity structure
Gas-lift well
Slim hole well
HPHT well
Squeezing salt well
Horizontal well
Permafrost well
Steam well