Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Waste Management Strategy - cuttings discharge
Casing Make-Up Torque
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
Pressure Testing Standards
HSE Plan (Example)
Basics of Electric Wireline Logging
Tripping Operations - Best Practices
Well Control Standards
Classification of BOP and well control equipment.
Sub-surface safety valves (SSSV)
Well Control Drills and Exercises
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Casing
Articles
Intermediate string
Conductor string
Surface string
Production string
Casing types definitions
Liner
Stove pipe, marine conductor or foundation pile
Connections Testing and qualification
Connections Selection and ordering
Casing Thread protectors
Connection sealing
Reliability and structural integrity of connections
Connections Surface treatments
Casing Thread Compounds Friction Factors
Connection Thread compounds
Connection types
Minimising Casing Wear
Casing wear and solutions
Monitoring Casing Wear
Monitoring Casing Condition
Influence of fatigue on casing strength
Influence of wear on casing strength
Influence of corrosion on casing strength
13.3/8 " Casing Running Programme
Casing and Liner Operations Planning
Casing and Liner Colour Codes
Casing Centralisation
Tie-Back Packers - General Information
Casing Operations Responsibilities
Casing and Liner Handling
Ordering casing
Casing Patches
4 1/2" liner running program example
4 1/2" Liner running programme
Tie-Back Packers - PBR Clean Out and Packer Setting
Casing and Liner Running Preparation Guidelines.
Weight Set Tie-Back Packer Make-Up
External Casing Packers
Casing Setting Depths
Example Casing Centralisers Programme
Casing and Liner Running Procedures
Mandrel Casing Hangers
Casing and Liner Pressure Testing
Hole Conditioning before Running Casing or Liner
Running and Setting Tie-Back Packer
Liner Tie-Back String
Preparation for Running Casing
Running and Testing Casing
Liner Lap Testing - Inflow Testing
Procedure For Running 30” Conductor
7" Liner Operations (Running and Cementing)
Casing Storage, Handling and Transport
Casing Make-Up Torque
Service loads
Fundamental equation for reduced axial force
Pressure (Collapse and Burst) loads on casing
Resistance to buckling
Service loads
Stove pipe, foundation pile, marine conductor and conductor string
Post-buckling analyses
Load bearing capacity
Installation loads
Installation loads
Collapse loads
Burst loads
Pressure loads (burst and collapse)
Casing Design Loads
Liner hanger selection - Design criteria
Detailed Design and Analysis
Basic aspects of rock mechanics
Casing scheme selection
Casing design considerations
Casing Design parameters
Procedures for leak-off and limit tests (LOT, LT, FIT)
Casing design factors
Slim hole well
Gravity structure
Permafrost well
Deep-water well
Reservoir compaction environment
Gas-lift well
Squeezing salt well
Steam well
Horizontal well
HPHT well