Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
HSE Plan (Example)
Pressure Testing Standards
Classification of BOP and well control equipment.
Casing Make-Up Torque
Depth Referencing
Basics of Electric Wireline Logging
Safety Valves
Drilling safety guidelines
Connection types
Tripping Operations - Best Practices
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Casing
Articles
Liner
Production string
Intermediate string
Surface string
Conductor string
Casing types definitions
Stove pipe, marine conductor or foundation pile
Connections Surface treatments
Connections Selection and ordering
Connections Testing and qualification
Connection Thread compounds
Reliability and structural integrity of connections
Connection sealing
Casing Thread protectors
Casing Thread Compounds Friction Factors
Connection types
Monitoring Casing Wear
Influence of fatigue on casing strength
Monitoring Casing Condition
Casing wear and solutions
Influence of wear on casing strength
Minimising Casing Wear
Influence of corrosion on casing strength
Casing and Liner Colour Codes
Weight Set Tie-Back Packer Make-Up
Casing Operations Responsibilities
Casing and Liner Handling
Casing and Liner Operations Planning
Casing Patches
4 1/2" Liner running programme
Example Casing Centralisers Programme
Ordering casing
Casing Centralisation
4 1/2" liner running program example
13.3/8 " Casing Running Programme
External Casing Packers
Running and Setting Tie-Back Packer
Casing and Liner Running Preparation Guidelines.
Preparation for Running Casing
Casing Storage, Handling and Transport
Tie-Back Packers - PBR Clean Out and Packer Setting
Tie-Back Packers - General Information
Hole Conditioning before Running Casing or Liner
Liner Tie-Back String
Procedure For Running 30” Conductor
Mandrel Casing Hangers
Casing Setting Depths
Running and Testing Casing
Casing and Liner Pressure Testing
Liner Lap Testing - Inflow Testing
Casing and Liner Running Procedures
7" Liner Operations (Running and Cementing)
Casing Make-Up Torque
Fundamental equation for reduced axial force
Installation loads
Pressure (Collapse and Burst) loads on casing
Installation loads
Post-buckling analyses
Service loads
Burst loads
Service loads
Stove pipe, foundation pile, marine conductor and conductor string
Resistance to buckling
Collapse loads
Load bearing capacity
Pressure loads (burst and collapse)
Casing Design Loads
Casing Design parameters
Detailed Design and Analysis
Liner hanger selection - Design criteria
Basic aspects of rock mechanics
Casing scheme selection
Procedures for leak-off and limit tests (LOT, LT, FIT)
Casing design considerations
Casing design factors
Squeezing salt well
Reservoir compaction environment
Slim hole well
Gravity structure
HPHT well
Horizontal well
Permafrost well
Deep-water well
Gas-lift well
Steam well