Drilling For Gas.com
Home
Drilling
Standards
Hole Problems
Directional
Rig Move
Calculations (Excel)
Slim Hole
Offshore
Misc. (Drilling)
Well Control
Planning
Primary Control
Secondary Control
Tertiary Control
Equipment
Checklists
Pre-spud
Drilling
Casing
Cementing
Completion
Misc. Checklists
Casing
Casing Types
Load Cases
Preliminary Design
Special Design
Connections
Corrosion, Wear, Fatigue
Casing Operations
QHSE
Production
Completion
Design
Operations
Equipment
Misc. Completion
Evaluation
Coring
Logging
Mud Logging
Well Testing
Mics. Evaluation
Planning
Driling Fluids
Mud Types
QA QC
Testing
Solids Control
Losses
Contamination
Misc. Drill Fluids
Cementing
Planning
Casing
Cement Plugs
Evaluation
Remedial
Search ...
Most Read
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
Casing Make-Up Torque
HSE Plan (Example)
Basics of Electric Wireline Logging
Pressure Testing Standards
Drilling safety guidelines
Tripping Operations - Best Practices
Well Control Standards
Classification of BOP and well control equipment.
Sub-surface safety valves (SSSV)
Waste Management Strategy - cuttings discharge
Latest
Completion Operation - Best Practices
Drilling programme 12.25" section HPHT
Cold Weather Operations Checklist
Coring Checklist
Weatherford Overdrive casing running and pick up/lay down machine - Checklist
16" Potential Problems - Best Practices
12.25" guidelines for tripping, making connections and back reaming
9 5/8" Wellhead and BOP Operations Checklist
Drilling program example (Semi-Sub)
Survey and Collision Avoidance Standards
Operation Programmes Standards
You are here:
Well Control
Articles
Kick Detection and Well Monitoring Equipment
Wireline Pressure Control Equipment
Drill String BOP Valves
General BOP Arrangement
Application and maintenance of secondary well control equipment
Example of BOP Configuration
Installation requirements for wellhead and BOP equipment
Maintenance and inspection of BOP equipment
Surface BOP equipment
Choke and Kill System
Diverter equipment
Subsea blowout prevention (BOP) equipment
Casing, wellhead and BOP equipment tests
Pressure Testing of Well Control Equipment
Classification of BOP and well control equipment.
Communicating information
Setting of retainers, bridge plugs and packers
Well Control - Abnormal pore pressures
Pre-Kick Planning
Contingency Stock Levels - Well Control
Hydrogen Sulphide (H2S)
Well Control - High Pressure Wells
Responsibilities for Well Control
Well Control Safety
Well Control Equipment and Procedures - Standards
Blowout contingency planning
Relief Well - Homing-In
Well Control Responsibilities
Well Control - Well Design
Mud Log Gas (background, drilled, swab, connection, trip)
Discussion on Suitability of Barriers (well control)
Well Control Drills
Shallow Gas - Planning Guidelines
Well Control - Shallow Gas
Well Control - H2S
Well Control Standards
Well Control Drills and Exercises
Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
Primary Control - Planning Considerations
Loss of primary well control - failure of riser
Fluid measuring devices
Avoiding loss of primary control
Influx Prevention
Well Control - Flowline Shows
Total Losses and Requirement for Continuous Fill-Up
Well Control - Preliminary record of information
Well Control - Primary Control Techniques
Influx Detection
Well Control - Loss of Primary Control
Inflow Testing Procedure
Pressure at the top of a Gas Influx in the Annulus using the "Driller's Method"
Well Kill Using Combined Volumetric Stripping
Well Control - Circulating heavy mud (bit off bottom)
Well Control Procedure - While on Bottom
Kicks with Drill Collars in the BOP Stack
Pressure at the top of a Gas Influx in the Annulus using the ‘Wait and Weight’ Method
Well Control Procedure - While Out of Hole
Well Kill Using The Driller's Method With The Bit On Bottom
Procedure and Calculation example for Change in Circulating Rate
Kicks with Casing in the BOP Stack
Well Control Procedure - While Tripping
Well Control - Slim Hole Drilling
Well Control - Kick whilst tripping
Well Control - Deviated and Horizontal wells
Bullheading
Problems Encountered During Well Control
Complications during well control operations
Well Control - Balanced Mud Method
Well Control during Logging Operations
Well Control - Stripping Method
Well Control - Recognizing a kick and action to be taken
Well Control - Combined stripping and volumetric method
Well Control - Volumetric Method
Well Control - Bullheading
Well Kill Using Wait and Weight Method (Balanced Method)
Well Control - Driller's Method
Non-conventional well control methods
Well Control - barytes and cement plugs.
Barite Plugs
Cement Plugs