1. Rig move preparation
- Location survey
- Road Survey
- Preparation of advanced loads
- Administration (Rig move plan)
- Equipment Inspection
2. Preparation of new location and camp
3. Logistics
- Number of Cranes
- Number of truck loads
- Lowboy truck loads
4. Load dimensions and weight
- Description of loads in their sequence
- List of wide loads for convoy
5. Rig move descriptions
- 5.1 Preparation
- 5.2 Pre-move loads
- 5.3 Rig release
- 5.4 Move safety meeting
- 5.5 Line of responsibility
- Chart of responsibility
- Job Descriptions
- 5.6 Daily move plan
- 5.7 Lower/ Raise mast procedures
- 5.8 Re-assembly substructure
6. Rig checklist
- Lowering Derrick
- Raising Derrick
7. Critical lifts
8. Lay-outs
- Rig Lay out
- Camp Lay-out rig site
- Camp Lay-out
9. Pre-spud inspection
- Safety
- General
- Drill floor
- Derrick
- Mud tanks
- Mud pumps
- Engines
- Equipment
- Drawworks
10. Daily move report
11. Rig drawing
12. Medivac procedures
- Ambulance Drill
- Notification chart
- Emergency Instructions