Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Drilling safety guidelines
  • Pressure Testing Standards
  • Basics of Electric Wireline Logging
  • Tripping Operations - Best Practices
  • Well Control Standards
  • Classification of BOP and well control equipment.
  • Sub-surface safety valves (SSSV)
  • Connection types

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Evaluation
  3. Logging
Articles
Radioactive Sources and Explosives
Stripping Over Electric Logging Cable
Fishing Wireline with Radioactive Sources
Fishing Equipment Required for Wireline Logging
Organisation and Responsibilities during Wireline Operations
Stuck Wireline Logging Tools
Logging Cables and Weak Points
Free Point Indication/ Backoff (FPI/ BO)
Acronyms logging tools - Baker Atlas
Acronyms logging tools - Schlumberger
Wireline Logging Fishing - Reverse Cut and Thread Procedure
Wireline Logging - Perforation
Wireline Logging Fishing - Cut and Thread Procedure
Pipe Conveyed Logging (PCL) – Preparation and General Guidelines
Wireline Logging Guidelines - Quality Control
Basics of Electric Wireline Logging