Tie-in data shall be provided by the Operations Engineer and sent to the rig for the Drilling Supervisor after completion of quality assurance check on each multi-shot MWD survey.
The tie-in data will include:
- tie-in depth AHBDF (ft)
- inclination (degrees)
- azimuth (degrees) - referenced to UTM
- True Vertical Depth Below Derrick Floor (TVBDF) (ft)
- northing (ft) - latitude
- easting (ft) - departure.