The survey accuracy requirements are dictated by the following:

1. Targets

The geological target should be as large as possible to minimize costs (directional drilling and surveying), considering the expected survey uncertainties.

2. Collision avoidance

The survey accuracy is defined by the separation factor (SF): the ratio between the 3D centre to centre well distance and this distance minus the inter-boundary distance between the envelopes of the borehole position uncertainty. For SF < 2.5 it is recommended to perform a full 3D proximity analysis. For SF < 1.5 it is recommended to have special approval to proceed with operations.

3. Blow-Out Contingency (BOC) requirement

The combined survey accuracy requirement for BOC is 15 metres maximum acceptable lateral borehole position uncertainty for any well entering a formation which could blow out. The combined uncertainty should be split between the well concerned and relief well.

4. Local legislation