Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Drilling safety guidelines
  • Pressure Testing Standards
  • Basics of Electric Wireline Logging
  • Classification of BOP and well control equipment.
  • Well Control Standards
  • Tripping Operations - Best Practices
  • Sub-surface safety valves (SSSV)
  • Connection types

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Drilling
  3. Rig Move
Articles
Site Restoration
Rig Move Inspection Requirements (Onshore Operations)
Truck Driver Rig Move Toolbox Meeting
Onshore Rig Moves - Well Status
Responsibiliites for Rig Move, Site Preparation and Site restoration
Rig Move Dailly Report (Onshore and Ofshore)
Offshore Rig Move Plan
Site Preparation for Land Wells
Responsibilities during offshore rig moves
Onshore Rig Move Plan - Table of Content
Offshore Rig Moves Planning and Preparation
Rig Move Planning (Safety and Review)
Offshore Rig Moves