Well Planning Information Sheet, Well Datasheet, Well Design Information. This is the list of information required by the drilling department to plan and design a well.

 

BLOCK / LICENCE

 

 

WELL NAME

 

 

WELL CLASSIFICATION

 

 

PARTNERS (with %'s )

 

 

COMMITMENTS/LICENCE CONSTRAINTS

-      Spud Date

-      Completion Date

-      Other Timing Constraints

-      Total Depth

 

 

PROPOSED SPUD DATE

 

 

UNITS OF MEASUREMENT

-      Depth (feet or meters)

-      Referenced to (MSL, LAT)

 

 

TARGET LOCATION

-      Seismic line

-      Shot point

-      Coordinates UTM

 

-      Surface Location Accuracy

-      Water Depth

-      Site Survey

 

 

TARGET SIZE / BOUNDARIES

 

 

OBJECTIVES

-      Primary Objectives

Name

Lithology

Depth

Thickness

Type of Fluids

Gradient/Gravity

H2S / CO2 / Chlorides ( ppm )

Target Tolerance

Hole angle constraints

 

-      Secondary Objectives

Name

Lithology

Depth

Thickness

Type of Fluids

Gradient/Gravity

H2S / CO2 / Chlorides ( ppm )

Target Tolerance

Hole angle constraints

 

GEOLOGICAL SEQUENCE

-      Geological sequence showing range of possible interval thicknesses and depths, and any uncertainties.

 

 

PRESSURE PROGNOSIS

-      Include actual reservoir pressure

-      Potential for overpressure

 

 

FORMATION STRENGTH PROGNOSIS

 

 

TEMPERATURE GRADIENT

 

 

FORMATION DIP

-      Dip angle and direction for all intervals

 

 

TOTAL DEPTH

-      Definition (e.g. 20 ft into basement)

-      TD core required

 

 

CORING REQUIREMENTS

-      Coring Policy (on shows etc )

-      Possible cored intervals

-      Estimated No. and thickness of cores

-      Restrictions on core size

-      Special requirements (oriented core, fibre glass inner barrels, low invasion system, etc.)

 

 

SAMPLING REQUIREMENTS

 

 

ELECTRIC LOGGING REQUIREMENTS

-      Top Hole Section”

Logs required

Optional logs

No. of runs

Estimated duration

 

-      Intermediate Hole Section

Logs required

Optional logs

No. of runs

Estimated duration

 

-      Reservoir Hole Section

Logs required

Optional logs

No. of runs

Estimated duration

 

-      Cased hole logging

Logs required

Estimated duration

 

-      Hole size restrictions / preferences

-      Constraints on drilling mud properties

-      Rathole req'd below last depth of interest

-      Log Data Transmission Requirements

 

 

VSP REQUIREMENTS

-      Type of survey ( VSP / check shot )

-      Estimated duration

-      Special requirements

 

 

TESTING REQUIREMENTS

-      Type of test

-      Testing Policy / Objectives

-      Hole / csg size restrictions / preferences

-      Est. No. and duration of tests (AFE )

-      Possible stimulation ( acidise, frac )

-      Testing fluid

-      Drilling mud tracer requirements

-      Depth correlation markers in casing

-      Wellhead / Tree requirements

-      Flaring requirements

-      Rathole required below test interval

 

 

POTENTIAL DRILLING PROBLEMS

-      Surface gas (Shallow seismic )

-      Overpressure

-      High Temperatures

-      H2S & CO2

-      Hole stability (Reactive shales,….)

-      Abrasive formations

-      Faulting

-      Hard stringers ( chert, quartzite,  etc )

-      Restrictions on bit types ( PDC )

 

 

DISCOVERY / APPRAISAL DRILLING

Sidetracking Option

Additional well(s)

Wellhead / Tree heights

Abandonment/Suspension Procedures

 

 

OFFSET WELLS

The following list is required (useful) for each offset well:

-      Mud logs

-      Composite logs

-      Pressure detection logs and tests

-      Drilling completion reports

-      Daily drilling reports

-      Daily geological reports

-      Any drilling related reports, mud recaps, IADC reports etc