Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Basics of Electric Wireline Logging
  • Pressure Testing Standards
  • Drilling safety guidelines
  • Tripping Operations - Best Practices
  • Well Control Standards
  • Classification of BOP and well control equipment.
  • Sub-surface safety valves (SSSV)
  • Waste Management Strategy - cuttings discharge

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Evaluation
Articles
Coring Fluids
Coring Assemblies
Coring Trouble Shooting Guide
Core Recovery, Handling and Packing
Wellsite Coring Guidelines
Coring Operational Planning, Guidelines and Procedures
Core Handling and Evaluation
Coring Operations Guidelines
Radioactive Sources and Explosives
Stripping Over Electric Logging Cable
Fishing Wireline with Radioactive Sources
Fishing Equipment Required for Wireline Logging
Organisation and Responsibilities during Wireline Operations
Logging Cables and Weak Points
Free Point Indication/ Backoff (FPI/ BO)
Stuck Wireline Logging Tools
Acronyms logging tools - Baker Atlas
Wireline Logging Fishing - Reverse Cut and Thread Procedure
Acronyms logging tools - Schlumberger
Wireline Logging - Perforation
Wireline Logging Fishing - Cut and Thread Procedure
Pipe Conveyed Logging (PCL) – Preparation and General Guidelines
Wireline Logging Guidelines - Quality Control
Basics of Electric Wireline Logging
Responsibilities for Evaluation Operations
Formation Evaluation - Organisation and Responsibilities
Evaluation Standards
Formation strength testing
FST Procedure
Formation Strength Tests Profiles and Definitions
Formation Strength Tests Calculations
What is petrophysics?
Well evaluation guidelines for exploration wells
Mud Logging - Cutting sampling and description requirements
Cuttings Sampling And Lithology Description
Mud and Data Logging
Mud Logging General Guidelines
Mud Logging - Parameters Monitoring
12. Well Testing - Typical production test contract
09. Well Testing - Contracting strategy
13. Well Testing - Specifications for skid mounted separators
10. Well Testing - HSE policy guidelines
06. Well Testing - Equipment preparation
04. Well Testing - Personnel and responsibilities
DST Programme Example
03. Well Testing - Production test data acquisition
02. Well Testing - Production test objectives
01. Introduction to Well Testing
08. Well Testing - Health, safety and environment
07. Well Testing - Operational recommendations
11. Well Testing - Test String Programme Example
05. Well Testing - Equipment description