Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Basics of Electric Wireline Logging
  • Pressure Testing Standards
  • Drilling safety guidelines
  • Tripping Operations - Best Practices
  • Well Control Standards
  • Classification of BOP and well control equipment.
  • Sub-surface safety valves (SSSV)
  • Waste Management Strategy - cuttings discharge

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Casing
  3. Casing Operations
Articles
Weight Set Tie-Back Packer Make-Up
13.3/8 " Casing Running Programme
4 1/2" liner running program example
Casing and Liner Operations Planning
Tie-Back Packers - PBR Clean Out and Packer Setting
Casing and Liner Handling
Ordering casing
Casing Setting Depths
4 1/2" Liner running programme
External Casing Packers
Tie-Back Packers - General Information
Casing and Liner Running Preparation Guidelines.
Casing Patches
Example Casing Centralisers Programme
Casing and Liner Colour Codes
Casing Operations Responsibilities
Hole Conditioning before Running Casing or Liner
Casing Centralisation
Running and Setting Tie-Back Packer
Procedure For Running 30” Conductor
Liner Lap Testing - Inflow Testing
Mandrel Casing Hangers
Liner Tie-Back String
Casing and Liner Pressure Testing
Preparation for Running Casing
Casing Storage, Handling and Transport
Casing and Liner Running Procedures
Running and Testing Casing
7" Liner Operations (Running and Cementing)
Casing Make-Up Torque