Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Basics of Electric Wireline Logging
  • Pressure Testing Standards
  • Well Control Standards
  • Drilling safety guidelines
  • Tripping Operations - Best Practices
  • Classification of BOP and well control equipment.
  • Waste Management Strategy - cuttings discharge
  • Sub-surface safety valves (SSSV)

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Drilling
  3. Offshore
Articles
Guidelines for Site Survey/ Hazard Requirements for Drilling Units
Posted Barge With Land or Modular Drilling Rig
Surveys required before rig move - Offshore
Land rig on artificial island (shallow water)
Types of vessel, offshore support
Surveying requirement for exploration well
Submersible drilling rig
Diving operations in exploration drilling
Modularised and Pile Elevated Drilling Rig
Drilling Rig on Pre-Installed Piles and Modules for shallow water depth
Steel Caisson and Drilling rig
Stand-by vessel duties, equipment and standards
Land rig on barge (with optional submerged caissons)
Heli-Rig
Cantilever Drilling Barge
Jacket Supported “Offshore’’ Rig
Standard Jack-Up
Shallow Draft Jack-Up
Semi-Submersible
Swamp Barge (With Optional Submerged Caissons)
Drilling program example (Semi-Sub)