Drilling For Gas.com
  • Home
  • Drilling
    • Standards
    • Hole Problems
    • Directional
    • Rig Move
    • Calculations (Excel)
    • Slim Hole
    • Offshore
    • Misc. (Drilling)
  • Well Control
    • Planning
    • Primary Control
    • Secondary Control
    • Tertiary Control
    • Equipment
  • Checklists
    • Pre-spud
    • Drilling
    • Casing
    • Cementing
    • Completion
    • Misc. Checklists
  • Casing
    • Casing Types
    • Load Cases
    • Preliminary Design
    • Special Design
    • Connections
    • Corrosion, Wear, Fatigue
    • Casing Operations
  • QHSE
  • Production
  • Completion
    • Design
    • Operations
    • Equipment
    • Misc. Completion
  • Evaluation
    • Coring
    • Logging
    • Mud Logging
    • Well Testing
    • Mics. Evaluation
  • Planning
  • Driling Fluids
    • Mud Types
    • QA QC
    • Testing
    • Solids Control
    • Losses
    • Contamination
    • Misc. Drill Fluids
  • Cementing
    • Planning
    • Casing
    • Cement Plugs
    • Evaluation
    • Remedial

Most Read

  • Calculation of Maximum Allowable Annular Surface Pressure (MAASP)
  • Casing Make-Up Torque
  • HSE Plan (Example)
  • Drilling safety guidelines
  • Pressure Testing Standards
  • Basics of Electric Wireline Logging
  • Classification of BOP and well control equipment.
  • Well Control Standards
  • Tripping Operations - Best Practices
  • Sub-surface safety valves (SSSV)
  • Connection types

Latest

  • Completion Operation - Best Practices
  • Drilling programme 12.25" section HPHT
  • Cold Weather Operations Checklist
  • Coring Checklist
  • Weatherford Overdrive casing running and pick up/lay down machine - Checklist
  • 16" Potential Problems - Best Practices
  • 12.25" guidelines for tripping, making connections and back reaming
  • 9 5/8" Wellhead and BOP Operations Checklist
  • Drilling program example (Semi-Sub)
  • Survey and Collision Avoidance Standards
  • Operation Programmes Standards
  1. You are here:  
  2. Drilling
  3. Misc. (Drilling)
Articles
Minimum safety stock for HPHT operations
Responsibilities for Abandonment
Sequence of Operations - Typical Offshore Well
Mechanical power to the bit / corehead
8.5" Section Drilling Programme HPHT
Underreaming
Cooper Oil Tools: MC2 compact wellhead
Abandonment programme - oil producer
Abandonment guidelines
Rig Team HPHT Checklists
Multilateral drilling programme
Responsibilities during drilling operations
Standard Drilling Tools
Whipstock Milling Operation - Best Practices
Mud cooler for HPHT wells
Conversions factors
Well Planning Information Sheet
Planning requirements for Managed Pressure Drilling (Mud Cap)
Ingram Cactus: Exact 15 Universal Slim-hole wellhead system
Sequence of Operations - Typical Onshore Well
General Guidelines for Sidetracking
Drilling Programme - Preparation and Content
Drilling Standards
HPHT procedures
Final / End of Well Report
Mechanisms of rock cutting
Abandonment and sidetrack drilling programme
Drill string vibrations
Operations with Mud Cap Drilling (MPD, Managed Presure Drilling)
Sidetracking Guidelines
Drilling programme 12.25" section HPHT
Sidetracking out of Casing with Whipstock
HPHT Drilling Procedures
Drill Pipe String Design (example)
Acronyms and Abbeviations
Depth Referencing