Responsibilities for the implementation, supervision, verification and control of rig moves and site work are listed in the following table:

Action

Execution

Quality Control

Ensure adherence to highway regulations

Transport Contractor

Drilling Contractor

Route planning

Drilling Contractor

Drilling Supervisor

Communications

Operator (Comms. Dept)

Drilling Supervisor

Load distribution

Transport Contractor

Drilling Contractor

Escort and move supervision

Transport Contractor

Drilling Contractor

High load

Transport Contractor

Drilling Contractor

Driver fatigue

Transport Contractor

Drilling Contractor

Reporting incident/accident

Drilling Supervisor

Drilling Supervisor

 

Site Preparation Responsibilities

Action

Execution

Quality Control

Initiate site preparation including collar

Drilling Contractor

Drilling Supervisor

Time/cost estimate for site construction

Drilling Contractor

Drilling Supervisor

Review survey and location date, mark site

Survey Contractor

Drilling Supervisor

Determine access, water supply (2 wells)

Contractor

Drilling Supervisor

Prepare site, cellar and conductor

Drilling Contractor

Drilling Supervisor

Site Restoration Responsibilities

Action

Execution

Quality Control

Dispose of garbage, level site 

Drilling Contractor

Drilling Supervisor

Fence off drying pit areas, cellar

Drilling Contractor

Drilling Supervisor

Contour site, grade roads

Drilling Contractor

Drilling Supervisor

Remove fencing when dried pits are backfilled

Drilling Contractor

Drilling Supervisor

Monitoring/inspection of site work

Drilling Contractor

Drilling Supervisor