Responsibilities for the implementation, supervision, verification and control of rig moves and site work are listed in the following table:
Action |
Execution |
Quality Control |
Ensure adherence to highway regulations |
Transport Contractor |
Drilling Contractor |
Route planning |
Drilling Contractor |
Drilling Supervisor |
Communications |
Operator (Comms. Dept) |
Drilling Supervisor |
Load distribution |
Transport Contractor |
Drilling Contractor |
Escort and move supervision |
Transport Contractor |
Drilling Contractor |
High load |
Transport Contractor |
Drilling Contractor |
Driver fatigue |
Transport Contractor |
Drilling Contractor |
Reporting incident/accident |
Drilling Supervisor |
Drilling Supervisor |
Site Preparation Responsibilities
Action |
Execution |
Quality Control |
Initiate site preparation including collar |
Drilling Contractor |
Drilling Supervisor |
Time/cost estimate for site construction |
Drilling Contractor |
Drilling Supervisor |
Review survey and location date, mark site |
Survey Contractor |
Drilling Supervisor |
Determine access, water supply (2 wells) |
Contractor |
Drilling Supervisor |
Prepare site, cellar and conductor |
Drilling Contractor |
Drilling Supervisor |
Site Restoration Responsibilities
Action |
Execution |
Quality Control |
Dispose of garbage, level site |
Drilling Contractor |
Drilling Supervisor |
Fence off drying pit areas, cellar |
Drilling Contractor |
Drilling Supervisor |
Contour site, grade roads |
Drilling Contractor |
Drilling Supervisor |
Remove fencing when dried pits are backfilled |
Drilling Contractor |
Drilling Supervisor |
Monitoring/inspection of site work |
Drilling Contractor |
Drilling Supervisor |