• Ensure derrick is level
  • 36” bit on floor
  • Sufficient 9” drill collars, on rack, strapped  (with top drive picked up prior spud)
  • Sufficient 8 ½” drill collars, x/o to reach csg point on rack, strapped
  • 10 stands 5” drill pipe made up and in derrick
  • 2 stds HWP drill pipe in derrick, pup jts available for space out.
  • 2 x Stabilisers 36” x 2 and pony DC ready, strapped ( if not one piece)
  • Ultra seal pill mixed 30 m3
  • Hi-vis spud mud mixed, mud system lined up – 250 m3
  • Cellar jet and centrifugal pump functioning
  • Contractor “C” plate on floor
  • Float equipment for inner string running tool, centralizers
  • DP centralizers, nails available
  • 30” casing laid out & strapped. 7 joints
  • Casing handling tools ready
  • Casing dope. Baker lock in stock
  • Circulating/cementing swedge available
  • 18 5/8” casing on racks
  • 18 5/8” pup joints range 1
  • 18 5/8” Centralizers
  • 18 5/8” Stop collars and Nails
  • 18 5/8” Circulating head
  • 18 5/8” Stinger for stab in shoe
  • 18 5/8” Stinger repair kit
  • 18 5/8” Landing stinger combo
  • Riser in cellar, check flow line connection compatible
  • Cement 60tonne, Bentonite 85 tonne & Barite 100 tonne  . On site
  • Jars on location – shock sub surface to 16” hole 2 Jars 8”  1 Shock 9.5”
  • Water pit full and deliverable to mud system          Pump checked for rate
  • Survey tool ready, totco ring inserted
  • Have cutting and welding equipt. ready plus welder  first well 1 plus backup
  • Have cementers check cmt quantity for next job
  • Top Drive if available functions correctly  backups ok?
  • Swivel available, tested and ready for install in case of top drive failure
  • High pressure wash gun
  • Screens for Shakers & Skalpers, Mud cleaner screen blanked