• Analyse logging and survey data from original hole
  • Select base of higher ROP interval as sidetrack point (probable over gauge hole overlying gauge hole)
  • Sidetrack point with inclination or dog-leg in original hole will be advantageous
  • Optimise cement slurry recipe (potential for gas cut)
  • Confirm cement quality by drill off test
  • BHA for first attempt should be capable of drilling to TD
  • Should first attempt fail then dedicated sidetrack BHA with tri-cone bit and 2.2 deg bend motor should be used to initiate sidetrack.
  • Dedicated sidetrack PDC bit (if available) should be on location