• Operations Engineer to organise pre-job meeting at the rig site with rig and office personnel to discuss the job objective and hazards.
  • Pictorials to be prepared and discussed during pre-job meeting so it can be followed during rigging up.
  • When MRX logging is required, ensure that two units available on location prior to starting the job.
  • Ensure that all personnel are standing clear of the catwalk when hoisting the tools from the cat walk to the rig floor.
  • Ensure that a tag line is attached to the load to keep control of any swinging.
  • When performing free point and back off operations, ensure that a correct bicycle size is used to avoid any potential damage to wireline  due to sheave damage.