Operations Engineer to organise pre-job meeting at the rig site with rig and office personnel to discuss the job objective and hazards.
Pictorials to be prepared and discussed during pre-job meeting so it can be followed during rigging up.
When MRX logging is required, ensure that two units available on location prior to starting the job.
Ensure that all personnel are standing clear of the catwalk when hoisting the tools from the cat walk to the rig floor.
Ensure that a tag line is attached to the load to keep control of any swinging.
When performing free point and back off operations, ensure that a correct bicycle size is used to avoid any potential damage to wireline due to sheave damage.