checklist

  • core hand on location
  • schlumberger vibro truck if required
  • logging tools for section
  • pup jnts for coring 7 or full kelly weatherford
  • 4 ½” csg tongs & 2 x power packs
  • run flare lines
  • completion containers
  • polish mill for 4 ½”
  • csng scraper for 4 ½” x 2
  • bits 3 ¾” x 3
  • flush all lines for completion, mud pumps choke, stand pipe…etc
  • batch mixer for liner job
  • note: break kelly prior to laying down same
  • Insure that the cleanout  string —drill pipe and dc’s are properly torqued with the  correct  torque values, when the dp and dc’s are being  handled  by the drilling crews
  • All of the  company clean out string handling tools—xo subs, slips,elevators,safety valves are used/ handled properly.