checklist

  • Test plug ready
  • Install wear bushing
  • Float valve installed
  • BHA on racks and strapped
  • Stabilizers, jars strapped and ready to RIH. Check jar hours
  • Bits, nozzles, tools and breaker on location
  • Bit hand on location
  • OBM weighted up
  • Get 9 5/8” csg on location, strap, drift, clean and dress. Have bakerlock on location
  • Back load 13 3/8” csg
  • Make sure Weatherford are on location and ready 1 day prior to casing run
  • Make sure cementers are ready, equipment serviced and silos full
  • Schlumberger & vibro truck
  • Stabilizers
  • Check contractors ton miles
  • Tubing head and accessories on location and prepared
  • Have mud man/solids control preparing diluted OBM
  • Coring equipment and personnel to be put on notice
  • Have cementers check cmt quantity for next job