checklistThe following checks should be performed before running Downhole gauges:

  • Review compatibility of SEM Interface Board with other DHG systems.
  • Ability to test Digital Gauges during completion work. . 
  • Monitoring of Gauges when running of completion. WGPT to utilise electrical downline with slip rings to allow continual monitoring.
  • Raise drill crews awareness of the requirement for operational DHG system.
  • Arrange presentation to rig crews.