- Is the T/A consistent with the hanger nipple and with the P-seals?
- Do you know the hanger nipple serial number?
- Do you know the tubing M/U torque?
- How many turns to close the SRT rams? (Check the number of turns required to close the SRT rams while the crew is testing the line to 600 bars).
- Measure the distance RT / Hanger nipple while the tubing is pulled at the beginning of the workover.
- Have you measured all the parts required to run the completion (landing joint, X-Over, Running tool, ...).
- Has everything been drifted?
- What are the distances NRT / SRT and SRT / TBF?
- Are the following equipment on site?
-
- Cntrol line
- Metal band
- Control line protectors (how many?)
- P-seals
- Test ring for control line
- During the job:
-
- Record weight up/down
- Record how many protectors and metal bands are used