• Wear Bushing retrieved
  • Pre-job safety brief held with all parties
  • Back up float and shoe equipment in store or easily available
  • All float equipment is PDC drillable and written on the tools
  • Tailing device available if required
  • Casing crew checked out tongs/power pack
  • Bakerlock/wire brush/barite available on rig floor
  • Float equipment checked out  Floats to be run in self-fill mode or not  Tabs/wedges removed if not to be run in self-fill mode
  • Float shoe and collar pre-installed and Bakerlocked
  • Centralisers and other consumables fixed as per program
  • Drilling Supv/Toolpusher checked out handling equipment
  • Crossover/s to DP + TIW valve on floor
  • Circ head/lo-torq on floor
  • Landing joint calipered and in spec (If applicable)
  • Sample of joints calipered to determine average ID
  • Pipe drifted, threads cleaned, tally checked, number of joints on rack confirmed and numbered
  • Pick-up/laydown equipment in position and serviceable, clear understanding between its crew and rig crew of procedure
  • Stabbing board functioning