- Wear Bushing retrieved
- Pre-job safety brief held with all parties
- Back up float and shoe equipment in store or easily available
- All float equipment is PDC drillable and written on the tools
- Tailing device available if required
- Casing crew checked out tongs/power pack
- Bakerlock/wire brush/barite available on rig floor
- Float equipment checked out Floats to be run in self-fill mode or not Tabs/wedges removed if not to be run in self-fill mode
- Float shoe and collar pre-installed and Bakerlocked
- Centralisers and other consumables fixed as per program
- Drilling Supv/Toolpusher checked out handling equipment
- Crossover/s to DP + TIW valve on floor
- Circ head/lo-torq on floor
- Landing joint calipered and in spec (If applicable)
- Sample of joints calipered to determine average ID
- Pipe drifted, threads cleaned, tally checked, number of joints on rack confirmed and numbered
- Pick-up/laydown equipment in position and serviceable, clear understanding between its crew and rig crew of procedure
- Stabbing board functioning