12.25″ guidelines for tripping, making connections and back reaming
Making connection
Wipe the full stand once by pumping out and reaming back down
Wipe the bottom single once by pumping out and reaming back down
The driller must nominate a responsible person to control the mud pumps (e.g DD, Toolpusher, AD). This person will be responsible for shutting down the pumps quickly in the event of a pack-off.
Tripping
The Drilling Supervisor will be on the rig floor from start of the trip out of hole until the string is in cased hole.
Prior to starting the trip (during circulating bottoms up) check the following:
Record up-weight, down-weight, rotating weight and off bottom torque.
Have a single of drill pipe available in the V door.
List of tight spots/intervals encountered during connections and previous trips
BHA schematic with measurements between stabilizers and bit
Upon encountering tight hole:
Go down and re-establish up-weight, down-weight, rotating weight and off bottom torque.
Apply overpull – starting with 20klbs – mark the pipe – go down – check the down drag – if negligible increase in down-drag then proceed by trying greater overpull.
Apply 30klbs overpull – mark the pipe – go down – check the down drag – if negligible increase in down-drag then proceed by trying greater overpull.
Apply 40klbs overpull – mark the pipe – go down – check the down drag – if negligible increase in down-drag then proceed by trying greater overpull.
Continue applying the above technique using 10klb increments up to a maximum of the weight of the BHA.
If on any overpull attempt, the down drag indicates that the pipe is becoming jammed, then make several attempts with less overpull.
If after several attempts there is no further progress (as seen from marks on the pipe) then go down, circulate clean – then try again.
If still no success to pass, then go down again and commence back-reaming procedures. Do not attempt to pump out of the hole as this may cause hydraulic compaction whereas rotation may disperse the blockage.
Do not make wiper trips unless hole conditions – such as unmanageable increase in torque or drag – dictate.
If during a trip, the crew have to change tour, ensure that the Tool Pusher on tour is at the brakes until a full handover is done between the drillers.
Back-reaming
Back-reaming should be used as the last resort and with the same flow rate that was used during drilling.
Back-ream for 5m maximum, circulate cuttings clear of the BHA, then try to pull through the obstruction again using the above procedure – without pumps or rotation.
During back-reaming the driller must nominate a responsible person to control the mud pumps (e.g DD, Toolpusher, KPO Drilling Supervisor). This person will be responsible for shutting down the pumps quickly in the event of a pack-off.
In the event of a pack-off:- stop the pumps – go down with the pipe (maintaining rotation) – re-establish circulation – circulate clean.
Attempt to pull through obstruction again without pumps or rotation.
Repeat the above process – with patience. The objective is to POOH with the absolute minimum of back-reaming.