It is the Company’s policy to conduct their activities in such a way as to take foremost account of the health and safety of their employees and of other persons, and to give proper regard to the conservation of the environment. In implementing this policy Company not only comply with the requirements of the relevant 10. Well Testing – HSE policy guidelines

*1 5000 psi well testing programme *1.1 Test objectives 1.To test the transition zone to determine the maximum water saturation at which oil will continue to be produced. 2.To determine the extent of the reservoir and the deliverability of the hydrocarbons. 3.To obtain representative samples of reservoir fluids for compositional, PVT analysis. *1.2 Basic data 11. Well Testing – Test String Programme Example

As each Production Test is specific, it is not normal for a COMPANY to have a contract in place such as the one briefly described in the next section. The norm is to enter a short-term contract agreement for a specified number of well tests and equipment and services required to support such an agreement. 12. Well Testing – Typical production test contract

These specifications apply to the design and fabrication of skid mounted production vessels, including all associated piping, fittings and valves, etc., mounted on the skid where intended use of the equipment for H2S service is at temperatures as low as -25°F. All material shall comply with NACE Standard MR-01-75, latest edition, “Sulphide Stress Cracking Resistant 13. Well Testing – Specifications for skid mounted separators