Evaluation

Evaluation work for an exploration well will be carried out from the Central Offices, so it is essential that the staff are kept up-to-date about what is happening in the field, and receive the data that they require, in the format they require. 1 General The Drilling manager should have a face-to-face meeting with Central Well evaluation guidelines for exploration wells

The following equipment should be available for stripping over a logging cable: Loggers fishing kit (to be supplied by Logging Contractor). Additional tension meter with cable tension readout for the Driller. 90 m of ¼” rope to control the run of cable going over the top sheave. 30 m of ½” rope to hold the Stripping Over Electric Logging Cable