Sequence of Operations: 1. M/U flow head assembly and pressure test selectively to 150 bar as follows: 1) From bottom up against bottom master valve. 2) From bottom up against swap and fail safe valve. 3) From bottom up through open fail safe valve against low torque valves of kill and flow line. 4) From TCP Perforating Programme

This article describe the requirements and specifications for workshop intended to support well services operations. The work undertaken by a typical workshop may include: quality assurance checking of new equipment; pressure testing of equipment; make-up and testing of new sub-assemblies; valve testing; testing and calibration of bottom-hole pressure/temperature survey equipment; maintenance, setting and testing of Workshop and support services

When buying tubulars, reference should be made on purchase orders to relevant international standards, such as API Specification 5CT and API Standard 5B on specifications for casing, tubing and threads. In the case of tubulars for example: 1.API SPEC 5CT, “Specification for casing and tubing”. Covers seamless and welded casing and tubing, couplings, pup joints Completion Operations – Buying tubulars

Guidelines for storing, handling and transporting completion tubing 1 Storage The design of pipe racks depends on local conditions (load capacity, degree of permanency, etc). Racks can be made with pipe supports (stringers) set on concrete or wooden bases. Drilltec aluminium racks should be considered for certain tubulars such as CRAs (Corrosion Resistant Alloys). Spacing Tubing storage, handling and transport