Checklists

As packers are probably one of the most important items of downhole equipment in well completions, great care must be taken with their preparation and installation where they are used. All packers should have been functionally checked and pressure tested in Base workshops before dispatch to the well site but should still be inspected before Checklist – Packer Running Operations

Do you need an electrician? Somebody must shut off th egenerators from the time the head is connected to the time the packer is 100 m below RT. Radio silence is also required. Thesame procedure should be applied when POOH. Generaly, no gauge ring is run if a scraper has been used. If another packer Wireline packer – checklist

core hand on location schlumberger vibro truck if required logging tools for section pup jnts for coring 7 or full kelly weatherford 4 ½” csg tongs & 2 x power packs run flare lines completion containers polish mill for 4 ½” csng scraper for 4 ½” x 2 bits 3 ¾” x 3 flush all Checklist Drilling 6″ hole section

The following checks should be performed before running Downhole gauges: Review compatibility of SEM Interface Board with other DHG systems. Ability to test Digital Gauges during completion work. .  Monitoring of Gauges when running of completion. WGPT to utilise electrical downline with slip rings to allow continual monitoring. Raise drill crews awareness of the requirement Down Hole Gauges – Checklist

Issues related to the preparation and/or abandonment should be included in the Well Planning Document. These could be related to a new well with or without a conductor installed or could be related to the abandonment of an existing well as a preparation for side tracking. Conductor Pre-installed conductors may need to be repaired or Preparation / Abandonment Checklist