  Pre – Trip Equipment Checks   The following are to be completed prior to tripping drill pipe.   Person or title   When completed   Tongs   Check and replace tong dies as necessary               Check for spare tong dies               Check Checklist Tripping Operations

Riser centered, secure and flow line leak free 26” bit, nozzles & tool on location Stabilizers, x/o’s, drill collars strapped, ready Totco ring inserted Shock sub made ready Ultra seal on location, +/- 60bbl pill mixed @ 30-40 ppb Mud engineer aware of property requirements Sufficient 8¼” drill collars, HWP on rack, strapped. Cmt, gel 26″ hole section checklist

Insure wear busing out of hole Check connections on retrieving tool & test plug Antifreeze in test fluid Pump through manifold Test cement unit w/chart Accumulator drill Remote panel function Test procedure Verify test pressures/times Check space out Spare test plug & rubbers Spare parts; gaskets, seals etc. Test Safety valves (IBOP, Gray valve) Open Checklist install and test BOP

Is the T/A consistent with the hanger nipple and with the P-seals? Do you know the hanger nipple serial number? Do you know the tubing M/U torque? How many turns to close the SRT rams? (Check the number of turns required to close the SRT rams while the crew is testing the line to 600 Checklist completion tubing running operations

General Information File name and location Well Name Classification Country Concession Ground Level Surface Location: Lattitiude ___ N, Longitude ___ E Surface Coordinates: Field ___ N, Field ___ E Seismic Line Cost Centre Planned Total Depth Rig Objective (top Hydrocarbon) Target Coordinates and Tolerances Coring requirements Casing Programme Summary Hole size / Depth / OD Drilling Programme – checklist

Loadout lists for 30″, 20″, 13 3/8″, 9 5/8″, 7″ casing operations Loadout list, Equipment list for 30″ conductor casing operations Qty Description – loadout list – equipment list Comments 1 jt 30” x 1” WT X52 conductor shoe joint Company 10 jts 30” x 1” WT X 52 conductor pipe Company 2 jts 30” Loadout List for Casing Operations

Grounding of the wellhead, vented junction box and switchboard should be checked. Phase rotation equipment should be used to ensure that the motor will rotate in the correct direction. All flowline valves should be opened. The voltages and kVA ratings of the power transformers should be checked. The fuses, overload and underload settings should be ESP – Checklist for starting up

Prior to commencement of each well the Drilling Supervisor with the assistance of the Drilling Contractor Toolpusher shall perform a full rig inspection and record the results on the Company Drilling Rig Inspections Report. The Drilling Supervisor shall ensure that downhole and surface equipment inspection requirements are met prior to and during drilling activities. Downhole Pre-Spud Drilling Equipment Suface and downhole Inspections

The documentation listed below must be available at the rig site prior to commencing the operations: Concurrent Drilling Completions and Production Operations (if applicable) Emergency Response Manual Wellhead Manual Drilling Operations Manual Signed copy of the Drilling/Completion Programme Code and Cost Manual General Data in Daily Reporting System Medivac Procedures Handover certificate HSE Manual

SAFETY Y / N Fire fighting equipment in place & tested   Emergency showers, eyewash stations & P.P.E in good condition   All equipment connected to earring system   Dangerous chemicals separated & warning signs posted   Safety signs posted at entrance of location & at relevant areas       General   Diesel sufficient Pre-Spud Checklist # 2