Completion

1 Objectives No harm to people or damage to the environment or equipment. Make up and run production tubing along with all down hole equipment first time and with full pressure integrity. Correctly space out of the completion and ensure the tubing hanger can be run, landed, locked and tested on first attempt. Ensure that Completion Operation – Best Practices

Completion Engineer to organise pre-job planning meeting at the rig site, with rig and office personnel to discuss the job objective and hazards. Prior to displacing well to a completion fluid, ensure that catch cans and trip tank are clean. Flush choke and kill lines from any loose debris. Wash BOP and pull wear bushing Completion Preparation

This article describes the following checklist for completion equipments: 1. Completion Equipment Preparation Checklist 2. Well Site Preparation Checklist 3. Make up/ Running Check Procedure 1. Completion Equipment Preparation Checklist This procedure shall be followed in addition to the Contractors’ own procedure. The Contractors shall at their base as a minimum perform the following:  When Completion equipment checklist

The following checks should be performed before running Downhole gauges: Review compatibility of SEM Interface Board with other DHG systems. Ability to test Digital Gauges during completion work. .  Monitoring of Gauges when running of completion. WGPT to utilise electrical downline with slip rings to allow continual monitoring. Raise drill crews awareness of the requirement Down Hole Gauges – Checklist