Is the T/A consistent with the hanger nipple and with the P-seals? Do you know the hanger nipple serial number? Do you know the tubing M/U torque? How many turns to close the SRT rams? (Check the number of turns required to close the SRT rams while the crew is testing the line to 600 Checklist completion tubing running operations

Loadout lists for 30″, 20″, 13 3/8″, 9 5/8″, 7″ casing operations Loadout list, Equipment list for 30″ conductor casing operations Qty Description – loadout list – equipment list Comments 1 jt 30” x 1” WT X52 conductor shoe joint Company 10 jts 30” x 1” WT X 52 conductor pipe Company 2 jts 30” Loadout List for Casing Operations

  Wear Bushing Pull Wear Busing Casing Tally Casing Pre-Install Float Shoe & Collar   Casing Equipment Tongs Spiders Centralizers Scratchers Plugs Baker Lock Pickup Line Fill up Line Stabbing Board                 Rig Floor Equip. Weight Indicator Slips Cut & Slip Drill Line Elevator String Up & Back 9 5/8″ casing running – Checklist